In its plan, Rīgas ūdens (Riga’s water utility) names Imanta first among the neighbourhoods with the most water main failures, but the horizontal pipes in the cellar and the risers are the building’s common property, decided together with the building manager. For a flat in a building of two to sixteen floors and for a detached house with its own supply pipe, this path differs.
Imanta’s buildings by number of floors
| Floors | What buildings | What plumbing needs to know |
|---|---|---|
| 2 | Houses of the “Imanta” flat cooperative on eight Imanta lines, built in the late 1920s | The oldest development in the neighbourhood; pipes may have been replaced several times, so the material can only be seen at an inspection |
| 5 | Grey series 464 and 467 blocks | Risers in the toilet duct, bathroom and toilet separate |
| 9 | White series 602 panel blocks with balconies outside the plane of the facade | Shutting off a riser affects nine floors; the working time is agreed by the building manager |
| 12–16 | Series 104 panel blocks, 12-storey brick “Czech project” buildings and a cluster of tower blocks by Anniņmuižas bulvāris, the oldest of which are the red-brick 16-storey blocks built around 1980–1990 (architects Z. Kalinka, V. Rauhvargere) | Long risers; the price is counted per section on one floor |
| detached houses | Detached house areas, which take up 14 % of Imanta | Own supply pipe, a meter chamber, a yard sewer line |
Imanta borders Iļģuciems, and from its centre to Imanta it is about 3.7 km (our map reading). In a series flat the riser is shared by the whole vertical, while in a detached house the owner has everything between the ownership boundary and the tap.
Ground, the Lāčupīte collector and the building’s outlet
In Imanta building conditions are mostly favourable: only 3.5 ha around the Imanta heat plant and the Zasulauks depot need engineering preparation, while the weakest ground is in the south-east between Slokas iela, Kurzemes prospekts and Jūrmalas gatve. The middle reach of the Lāčupīte up to the northern part of Imanta is channelled into a reinforced concrete collector. If a yard pipe has to be relaid in weak ground or close to an underground structure, the plumber can judge the digging spot and the scope only on site.
Stage 5 of the Cohesion Fund project brought 10.3 km of water main, plus 10.8 km of sewer, to the streets of north-west Imanta, so 185 households could connect. A city main in the street does not yet mean the building is connected: the owner is responsible for the section from the ownership boundary to the building. For the building’s outlet from the cellar, LBN 221-15 requires a fall of no less than 20 ‰, that is 2 cm per metre, and the outlet cannot be narrower than the largest riser connected to it. A 100 mm outlet from the riser or cleanout to the axis of the inspection chamber may be no longer than 12 m, a 50 mm outlet no longer than 8 m.
The Rīgas ūdens boundary is usually set by the wall of the meter chamber (its outer side). On a plot without a chamber the boundary runs along the plot boundary or the street’s red line. Checked 16.11.2026.
High groundwater by Beberbeķu iela and Ķiburgas iela
Rīgas ūdens has pointed to a high groundwater level in the part of Imanta around Beberbeķu iela and Ķiburgas iela. Drainage ditches and culverts there must be maintained by the owner of the plot on whose land they lie.
A ditch and a culvert are not plumbing, and cleaning them is the owner’s job. The plumber’s part is the yard sewer line and its chambers. If after rain the drain in the house runs away more slowly, first look in the yard chamber: does the water stand higher than the pipe’s inlet. That shows whether the problem is in the line up to the chamber or further on.
A street water main failure is not a flat’s failure
The large number of street failures cited in the Rīgas ūdens long-term plan also means rebuilding work on streets. On Jūrmalas gatve, on the stretch from Zolitūdes iela to Imantas 7. līnija, Rīgas ūdens announced a 2.3 km water main reconstruction with a new low-pressure water main to supply Imanta and Beberbeķi.
If the water disappears in the whole building or street, a plumber in the flat will not restore it. Ask your building manager or watch the water supplier’s notices. When the water returns, the pipes may contain air and sediment: run the cold water until it becomes clear. If the tap then flows weakly, most likely the tap strainer is clogged; you can unscrew it and rinse it yourself.
Prices for Imanta buildings and detached houses
- Yard sewer line cleaning: from €50 per call-out (1st hour), longer work is charged by the hour.
- Laying a water pipe: from €10/m.
- One water or drain connection point: from €35 per point.
- Soil stack section replacement: from €100 per section on one floor.
Example for a detached house: 6 m of water pipe from the supply pipe to the bathroom and two connection points (a sink and a washing machine): 6 × from €10/m + 2 × from €35 = at least €130. Labour only; materials are extra. Whether the trip is charged separately, the plumber tells you on the call before the work.
A detached house’s line and a flat’s riser: where to start
For a detached house’s line there is drain cleaning and pipe repair. For a series flat, riser replacement and towel rail replacement fit. For a private house’s heating there is heating system flushing, and for a new washing machine connection washing machine connection.
Sources
- Imanta’s area is 900.3 ha checked 16 November 2026
- Detached house areas 14 %; the middle reach of the Lāčupīte in a reinforced concrete collector checked 16 November 2026
- Series 464, 467 and 602; the Imanta lines; 16-storey brick blocks by Anniņmuižas bulvāris (Z. Kalinka, V. Rauhvargere) checked 16 November 2026
- Building conditions mostly favourable; 3.5 ha around the heat plant and the Zasulauks depot; weakest ground in the south-east checked 17 November 2026
- Series 104 and Czech project buildings in Imanta checked 16 November 2026
- Stage 5: 10.3 km of water main, 10.8 km of sewer, 185 households checked 16 November 2026
- Ownership boundary and the customer’s responsibility checked 16 November 2026
- High groundwater around Beberbeķu iela and Ķiburgas iela; ditches are maintained by the landowner checked 16 November 2026
- Imanta first by number of water main failures checked 16 November 2026
- Rīgas ūdens announcement on the 2.3 km Jūrmalas gatve water main reconstruction checked 16 November 2026
- Horizontal pipes replaced at Slokas iela 169 (2019) checked 16 November 2026
- Public taps at Jūrmalas gatve 133 and Anniņmuižas bulvāris 77 checked 16 November 2026
- Outlet: fall of at least 20 ‰, diameter no smaller than the riser, length to the chamber 8/12 m, 0.2 m gap in the wall, sealing sleeve in wet ground (LBN 221-15) checked 16 November 2026